The Grid Code outlines the technical, planning and operational requirements for the installation, or modification, of Distributed Generation (DG) projects connecting to BL&P's Grid at 24.9 KV and below. This document applies to all single-phase or three-phase DG facilities regardless of the size. Existing generator facilities with existing connections only need to comply with this document starting from the time when substantial modifications to the generator facility or its connection are made.
This document is intended to be applied to electric power generators using all types of energy sources, energy storage and energy conversion technologies – directly connected synchronous and asynchronous rotating machines, and those connecting via inverters or static power converters which connect at or below the threshold mentioned above. To view the code please download the attachment below.
For all renewable energy (RE) queries, including those from RE developers and IPPS, please email requeries@blpc.com.bb.